Projects: wind turbine decommissioning across Germany

Dismantling a wind turbine seen from above: rotor and nacelle on the ground next to the crawler crane

Selected projects

Decommissioning, secondary market and incidents

We’ve decommissioned more than 300 wind turbines so far, over 100 of them in 2026 alone. Sometimes it’s a single turbine affected by an incident, sometimes an entire wind farm, with more than 20 turbines in some cases.

Two cranes at the tower of a NEG Micon NM72 in the Düsedau wind farm

Düsedau wind farm

We took down five NEG Micon NM72 turbines here. The rotor blades went to recycling, and the foundations and crane pads were removed completely.

Client
EnBW
Turbines
5 × NEG Micon NM72
Year
2026
Dismantling work on a wind turbine tower in the Volkmarsdorf wind farm

Volkmarsdorf wind farm

Fifteen turbines from three manufacturers, plus foundation removal. We sold eleven Enercon E-66 on the secondary market for continued operation.

Client
swisspower
Turbines
11 × E-66, 3 × Nordex, 1 × E-40
Year
2026
Rotor blade on the crane during decommissioning in the Ablaß wind farm

Ablaß wind farm

Seven NEG Micon NM64c turbines with a 68 m hub height. We resold individual components, and the GRP and steel went to recycling.

Client
eab New Energy
Turbines
7 × NEG Micon NM64c-68m
Year
2026
Aerial view of decommissioning in the Japons wind farm

Japons wind farm

Seven DeWind D8 turbines decommissioned. We sold individual assemblies on the secondary market and recycled the rest.

Client
Vestas
Turbines
7 × DeWind D8
Year
2026
Work basket on the crane during decommissioning after a blade failure

Keltische Schanze wind farm

After a rotor blade broke off, we secured the NM82, recovered it and then decommissioned it.

Client
EDF renewables
Turbines
1 × NEG Micon NM82
Year
2026

Your wind farm

Planning a decommissioning or repowering project? Tell us about the site, the turbines and your time frame, and we’ll come back with a first assessment.

Client
Turbines

More references

  1. 2026Alterric

    Voigtei-Deblinghausen wind farm

    9 × Enercon E-66/18.70

    • foundations included
    • blade recycling
    • steel recycling
  2. 2026Landvolk Diepholz

    Barver wind farm

    5 × Vestas V80

    • foundations included
    • blade recycling
    • steel recycling
    • component sales
  3. 2024RWE

    Lesse-Barbecke wind farm

    10 × Enercon E-66/18.66

    • foundations included
    • blade recycling
    • steel recycling
    • copper & ring generators
    • component sales
  4. 2024Alterric

    Steyerberg wind farm

    10 × Enercon E-66, 1 × E-70

    • foundations included
    • blade recycling
    • copper & ring generators
    • component sales
  5. 2024Alterric

    Bertkow-Baben II wind farm

    9 × Enercon E-66

    • foundations included
    • blade recycling
    • steel recycling
    • component sales
  6. 2024Alterric

    Dorna wind farm

    8 × Enercon E-66/18.70

    • full recycling
  7. 2024Qualitas EnergyNextWind

    Sebbenhausen wind farm

    8 × Vestas V80

    • blade recycling
    • steel recycling
    • component sales
  8. 2024Alterric

    Bertkow-Baben wind farm

    4 × Enercon E-66/18.70

    • full recycling
    • copper & ring generators
  9. 20243U ENERGY PE

    Langendorf II wind farm

    7 × GE (Enron) 1.5 sl

    • blade recycling
    • steel recycling
    • component sales
  10. 2024REZ Regenerative Energien Zernsee

    Zschornewitz wind farm

    7 × DeWind D6-1000

    • blade recycling
    • steel recycling

Milestones

Projects that shaped us

  1. 1,700 tLargest rotor blade recycling project

    2018 – still the largest rotor blade recycling project, approved under the BImSchG.

  2. “Jade”Industrial project

    Together with the Varel paper and board mill.

  3. 2024Mobile sawing unit

    Rotor blades cut up directly on site.

Planning a decommissioning?